EP 5 - Plumbing, Rock Foundation & Door Framing
- Jan 31, 2022
- 1 min read
In Episode 5,
I had a clear allergic reaction which just left me feeling really under the weather the entire week. A skin breakout can really damage confidence as well as productivity however it still was a very productive week so we give thanks. We managed to cast the lintel and cast the floor in the store room as well as begin the rock foundation for the porch. Alongside that we preserved the main wood for the veranda so overall a very productive week so we give thanks.
All Support is welcome.
Keep up with the journey by subscribing.









![2020 - J Ezza FT Nathaniel Shalom - TAKE ME BACK [ Music & Editorial ]](https://static.wixstatic.com/media/9910ac_f168c77d6ed641e091530021283b6028~mv2.png/v1/fill/w_250,h_250,fp_0.50_0.50,q_35,blur_30,enc_avif,quality_auto/9910ac_f168c77d6ed641e091530021283b6028~mv2.webp)
![2020 - J Ezza FT Nathaniel Shalom - TAKE ME BACK [ Music & Editorial ]](https://static.wixstatic.com/media/9910ac_f168c77d6ed641e091530021283b6028~mv2.png/v1/fill/w_74,h_74,fp_0.50_0.50,q_95,enc_avif,quality_auto/9910ac_f168c77d6ed641e091530021283b6028~mv2.webp)
Comments